Although they look a little 'severe' in appearance at the moment, once the authentic rounded corners are attached at the top of the windscreens and the surrounding panelling is fitted, the Railcoach should start to come together.
Friday, 14 October 2011
Windscreens arrive and trial fitted
Although they look a little 'severe' in appearance at the moment, once the authentic rounded corners are attached at the top of the windscreens and the surrounding panelling is fitted, the Railcoach should start to come together.
Sunday, 23 January 2011
Destination Boxes arrive
Four destination boxes have been manufactured specially for 279 by Indicators International in Northern Ireland. They have already been fitted with former Railcoach blinds as illustrated and the boxes will be fitted to the main cab frame. A surrounding steel frame then needs fabricating which will then finally allow the roof dome to be constructed.Rewiring of the cabs continues whilst delivery of the new cab windscreens is expected in the next couple of weeks.
Sunday, 29 August 2010
Frame ends fitted & panelling starts
Both frame ends have been fitted onto the main structure this week. Handbrake columns have been fitted in both cabs and the car's glazing has been fitted - with the surrounding timberwork in the saloons in progress. Work has also started on the panelling of the tram.Panels are on-hand for the area underneath the windscreen whilst Blackpool Transport has lent us the Balloon-car roof dome in the hope that a panel off this cabn be used to create the Railcoach roof dome where it meets the former sunshine roof.
Monday, 9 August 2010
Steel ends fabricated - and ready for fitting
Two new steel-framed cabs, fabricated offsite at South Shore Metal Fabrications, arrived today and have been put into position ready for fitting. There are some minor tweaks to undertake, but once these are complete, the ends can be panelled and glazed. In the interim, handbrake & controllers will be put into place and painting of the cabs has started.
Saturday, 24 July 2010
Plenty of seats inside the car...
Partly to satisfy a need to ensure the seat frames were all correctly aligned, but also to inspire us further along the road to completion, a trial fitting of seat backs was undertaken today. It certainly transforms the internal appearance of 279 - making it look much more complete. A full set of seats are to be retrimmed at the BusWorks in Blackpool in the traditional dark green tram moquette.
Friday, 23 July 2010
Swingover seats refitted
Swingover seat frames have been refitted to 279 this week, following powder coating and modifications to fit the seat rail fitted to '679' when it received bus seats. On the exterior repanelling of the cant-rail has started whilst at South Shore Metal Fabrications, the steel-framed ends are progressing well. But more of that next week...
Wednesday, 14 July 2010
New half-drop windows fitted
Eight new half-drop window units, fabricated by Cheshire Vehicle Windows, have been fitted to 279. The units were ordered after problems sourcing sufficient original units for 279 and the need to fit toughened safety glass. Interior woodwork has been revarnished and refitted, whilst 24 swing-over seat frames have been repaired and powder coated in green gloss ready for refitting.After a false start, South Shore Metal Fabrications are fabricating new cab frames for 279, based on photos supplied and an original cab end from Balloon Car 717.
Wednesday, 5 May 2010
No.1 end new cab underframe fitted
Progress on 679's transformation to EE Railcoach 279 has slowed awaiting the fabrication of the new steel cab underframe at the No.1 end of the car. However, this is now fitted and was painted in protective red oxide today. This end is now ready for floor-boarding and refitting the handbrake and compressor govenor equipment.Other news is that new half-drop window units are on order from Cheshire Vehicle Windows.
Monday, 8 March 2010
Fits like a glove!
Further fabrication work has taken place today and this view shows the trial fitting of a cab door (borrowed off Balloon car 704) to test the critical shape of the offside corner. The door from 704 has been used to get the gentle slope of the lower portion of the cab frame and the windscreen rake. From this critical section, the nearside pillar can be fabricated.
Tuesday, 2 March 2010
Framework assembly starts
The assembly of the EE Railcoach end profile has commenced on 279 today, recreating an appearance last seen on this car in 1960 and that disappeared from the tramway in 1973 after car 615 was withdrawn for rebuild in OMO car 11. Steel is being used for "crash-worthiness" in common with Blackpool Transport's own Balloon car rebuilds.
Sunday, 28 February 2010
Controller refitted
Thursday, 25 February 2010
Cab floor fitted
Saturday, 20 February 2010
279 now fitted with Railcoach underframe
Another milestone in the restoration of 279 has been achieved today - the refitting of a Railcoach shaped cab underframe. The steelwork is actually the same shape as a Balloon car and, now fitted, work can progress rapidly on fitting a cab floor and then the new steel framed cab ends.A cab door has been borrowed off Balloon Car 704 to help inform the shape of the cab framing.
Saturday, 13 February 2010
Cab end prepared for new underframe
The No.2 cab end has been prepared for its new underframe which has involved removing the brake pipe work and sorting out all traction and auxiliary wiring.It is hoped to have the traditional Railcoach style cab underframe refitted next weekend and as soon as this is in place, the fabrication of the end framing will commence.
Sunday, 24 January 2010
Window frames prepared for glazing
Work on "279" this week has concentrated on the cab ends and preparing the window frames. The No.2 end cab underframe has been cut off whilst the floorboarding at No.1 end has been substantially stripped and now awaits the removal of the Z6 controller before the underframe can be cut-off at this end too.Other progress has been the completion of preparation work on the internal window frames ready for re-fitting glazing and half drop window units. The frames have been given a coat of protection red oxide paint.
Sunday, 10 January 2010
January 2010 - Progress Report
Now that the window frames on the exterior have been cleaned up, attention has turned to the interior. Each window frame has been cleaned up and old screws/nails etc. removed ready to receive new glass and timber surrounds. However, first the frames will be treated with protective paint. It has also been decided to remove the decorative timber underneath the frames and treat the main framework behind.
Monday, 28 December 2009
Dec 2009 - Progress Report
The autumn months have witnessed volunteers focus on assistance with restoration work on 143 and several LTT events but the onset of winter has allowed work to resume on the Railcoach.Both cabs are now stripped down awaiting the Trailer towing car steel cab underframes to be cut-off. On the body sides, the flush mounted glazing panels have all been removed and the window frames have now been cleaned up ready for painting. The lower framework has been treated to a coat of red oxide and the steelwork de-rusted and painted.
Above the window line, the flat mouldings have also been removed and the panels cleaned up ready for the original style mouldings to be refitted.
Monday, 21 December 2009
June 2009 - Cab Stripped off
April 2009 - 679 moves for restoration
679 was moved from Rigby Road depot to the LTT's Brinwell Road premises on the morning of Saturday 25th April. 679 was acquired by the LTT in October 2008 for restoration back to a streamlined English Electric Railcoach.New pointed end cab underframes will be fitted and a steel framed streamlined end (similar to those fitted to refurbished Balloon cars). Original style glazing, half-drop windows and swingover seats will also be fitted as part of the restoration. Work will be completed in time for "279" to return to the tramway in 2010 for the 125th anniversary year.
Nov 2008 - 679's final tour
679 made a farewell outing on the tramway on Saturday 29th November on a specially commissioned tour with Coronation car 304, prior to restoration to a genuine EE Railcoach.In freezing fog, 679 operated Tower to Thornton Gate with 304 allowing enthusiasts to swap vehicles. Bus 529 from the LTT collection also shadowed the tram shuttle, allowing unique photograph opportunities.
Unfortunately, a problem with the trolley head on 304 prevented it's last trip to Fleetwood but 679 and bus 529 coped with the 84 tour participants.