Sunday, 28 February 2010

Controller refitted

The Z6 controller and handbrake column have been put back onto the No.2 end cab floor in advance of the steel framed end being fitted this week.

Thursday, 25 February 2010

Cab floor fitted

In preparation for the steel framed ends being fitted, rapid progress has been made fitting the new plywood cab floor. Arcen Construction, a local Blackpool firm, is making the cab framing but in advance of this the hand-brake and Z6 controller will be refitted.

Saturday, 20 February 2010

279 now fitted with Railcoach underframe

Another milestone in the restoration of 279 has been achieved today - the refitting of a Railcoach shaped cab underframe. The steelwork is actually the same shape as a Balloon car and, now fitted, work can progress rapidly on fitting a cab floor and then the new steel framed cab ends.

A cab door has been borrowed off Balloon Car 704 to help inform the shape of the cab framing.

Saturday, 13 February 2010

Cab end prepared for new underframe

The No.2 cab end has been prepared for its new underframe which has involved removing the brake pipe work and sorting out all traction and auxiliary wiring.

It is hoped to have the traditional Railcoach style cab underframe refitted next weekend and as soon as this is in place, the fabrication of the end framing will commence.

Sunday, 24 January 2010

Window frames prepared for glazing

Work on "279" this week has concentrated on the cab ends and preparing the window frames. The No.2 end cab underframe has been cut off whilst the floorboarding at No.1 end has been substantially stripped and now awaits the removal of the Z6 controller before the underframe can be cut-off at this end too.

Other progress has been the completion of preparation work on the internal window frames ready for re-fitting glazing and half drop window units. The frames have been given a coat of protection red oxide paint.

Sunday, 10 January 2010

January 2010 - Progress Report

Now that the window frames on the exterior have been cleaned up, attention has turned to the interior. Each window frame has been cleaned up and old screws/nails etc. removed ready to receive new glass and timber surrounds. However, first the frames will be treated with protective paint. It has also been decided to remove the decorative timber underneath the frames and treat the main framework behind.

Monday, 28 December 2009

Dec 2009 - Progress Report

The autumn months have witnessed volunteers focus on assistance with restoration work on 143 and several LTT events but the onset of winter has allowed work to resume on the Railcoach.

Both cabs are now stripped down awaiting the Trailer towing car steel cab underframes to be cut-off. On the body sides, the flush mounted glazing panels have all been removed and the window frames have now been cleaned up ready for painting. The lower framework has been treated to a coat of red oxide and the steelwork de-rusted and painted.

Above the window line, the flat mouldings have also been removed and the panels cleaned up ready for the original style mouldings to be refitted.