Sunday, 28 February 2010
Controller refitted
The Z6 controller and handbrake column have been put back onto the No.2 end cab floor in advance of the steel framed end being fitted this week.
Thursday, 25 February 2010
Cab floor fitted
Saturday, 20 February 2010
279 now fitted with Railcoach underframe
Another milestone in the restoration of 279 has been achieved today - the refitting of a Railcoach shaped cab underframe. The steelwork is actually the same shape as a Balloon car and, now fitted, work can progress rapidly on fitting a cab floor and then the new steel framed cab ends.
A cab door has been borrowed off Balloon Car 704 to help inform the shape of the cab framing.
A cab door has been borrowed off Balloon Car 704 to help inform the shape of the cab framing.
Saturday, 13 February 2010
Cab end prepared for new underframe
The No.2 cab end has been prepared for its new underframe which has involved removing the brake pipe work and sorting out all traction and auxiliary wiring.
It is hoped to have the traditional Railcoach style cab underframe refitted next weekend and as soon as this is in place, the fabrication of the end framing will commence.