Thursday 25 February 2010

Cab floor fitted

In preparation for the steel framed ends being fitted, rapid progress has been made fitting the new plywood cab floor. Arcen Construction, a local Blackpool firm, is making the cab framing but in advance of this the hand-brake and Z6 controller will be refitted.