Controller refitted
The Z6 controller and handbrake column have been put back onto the No.2 end cab floor in advance of the steel framed end being fitted this week.
Newer Post
Older Post
Home
Railcoach 279
Links
Brush Railcoach 624 - blog
LTT News
Blog Archive
►
2011
(2)
►
October
(1)
Windscreens arrive and trial fitted
►
January
(1)
Destination Boxes arrive
▼
2010
(14)
►
August
(2)
Frame ends fitted & panelling starts
Steel ends fabricated - and ready for fitting
►
July
(3)
Plenty of seats inside the car...
Swingover seats refitted
New half-drop windows fitted
►
May
(1)
No.1 end new cab underframe fitted
►
March
(2)
Fits like a glove!
Framework assembly starts
▼
February
(4)
Controller refitted
Cab floor fitted
279 now fitted with Railcoach underframe
Cab end prepared for new underframe
►
January
(2)
Window frames prepared for glazing
January 2010 - Progress Report
►
2009
(5)
►
December
(5)
Dec 2009 - Progress Report
June 2009 - Cab Stripped off
April 2009 - 679 moves for restoration
Nov 2008 - 679's final tour
Oct 2008 - 679 secured for preservation